« movie | Main | suppliers »

design changes for frame 03

I like the bolts-through-springs approach but it would be better still if there were spacer tubes so the springs can't touch the threads. In short, 4-40 bolt inside a 3/4" spacer; spring around that; bracket around spacer engaging spring. I haven't been able to find a similar bracket with a large enough drill hole but drilling them out isn't hard.

It is starting to become clear that there are important physical differences between link-type treads and big rubber bands with holes in them. They are not the only elegance/money tradeoff, however.

TrackBack

TrackBack URL for this entry:
http://robotarmy.org/cgi-bin/mt/mt-tb.cgi/8

About

This page contains a single entry from the blog posted on November 1, 2007 12:00 AM.

The previous post in this blog was movie.

The next post in this blog is suppliers.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.35